Government

DCAMM Accelerated Energy Program

The primary objective of this program is to reduce costs and improve the maintenance and operation of the Commonwealth’s publicly owned buildings. CHA has conducted energy audits, retro-commissioning studies, toward zero net energy studies (TZNE), developed basis of design documents, and provided commissioning services for state government building upgrade projects. CHA provided:

  • Construction administration and commissioning oversight on the Franklin County Sherriff’s Department Chapter 25A Energy Design-Build (DB) project
  • Ongoing Performance Verification (OPV) services for the Berkshire County Jail (BCJ) & House of Correction (HOC) energy efficiency improvement project
  • Energy engineering services for an ASHRAE Level 2 energy audit of the Department of Corrections, Boston Pre Release Center located in Roslindale, MA

Project summary

Level 2

Detailed ASHRAE Level 2 energy audit.

>3

Performing over three projects.

0

Conducting zero net energy studies.

Talk to an expert

Mitch DeWein, CEM

Mitch DeWein, CEM
Project Team Leader, Generation and Energy

Get in touch

Mitch is a senior energy analyst and oversees detailed energy assessments, cogeneration studies and district energy plans. He brings 10 years of experience in mechanical system design, equipment selection, energy analysis, construction cost estimation, and design coordination.