Water Resources

Scottsburg Wastewater Treatment Plant Expansion

The City of Scottsburg expanded its wastewater treatment plant to address regulatory compliance requirements and accommodate future growth. CHA served as the design partner on a design-build team, delivering a comprehensive, phased solution. The Build?Operate?Transfer (BOT) procurement method enabled the city to implement over $19 million in improvements with strategic financing. Sequencing Batch Reactor (SBR) technology was selected to resolve compliance challenges and increase capacity efficiently.

Facility upgrades included new reactors, expanded process equipment, upgraded disinfection systems, and improvements to headworks and influent pumping. Existing SBR assets were repurposed for aerobic digestion and post-treatment flow equalization, supporting long-term operational efficiency. These improvements resolved enforcement actions and positioned the city to support industrial growth.

Project summary

2.7 MGD

The project increased average treatment capacity to 2.7 MGD.

6 MGD

Upgrades support a 6 MGD peak wet weather treatment capacity.

$19M

Total project investment delivered through phased financing.

Talk to an expert

Mark Sullivan, PE*

Mark Sullivan, PE*
Business Development Leader

Get in touch

Mark has more than 30 years of experience providing water, wastewater, and stormwater consulting services to municipal and private utility clients. His expertise spans infrastructure planning, funding, design, and project delivery, including successful implementation of SRF, USDA Rural Development, OCRA, and alternative procurement programs. Mark has led the planning and design of wastewater collection, pumping, and treatment systems; water treatment, filtration, and storage facilities; and numerous stormwater studies and capital improvement projects.